Earth pressure balance, or EPB, is a mechanised tunneling method in which the excavated material is used to support the tunnel face whilst it is being plasticised using foams/slurry & other additives to make it transportable and impermeable. The spoil is admitted into the tunnel boring machine (TBM) via a screw conveyor (cochlea) arrangement which allows the pressure at the face of the TBM to remain balanced without the use of slurry.