language-icon Old Web
English
Sign In

Integrated project delivery

Integrated project delivery (IPD) is a collaborative alliance of people, systems, business structures and practices into a process that harnesses the talents and insights of all participants to optimize project results, increase value to the owner, reduce waste, and maximize efficiency through all phases of design, fabrication, and construction. Integrated project delivery (IPD) is a collaborative alliance of people, systems, business structures and practices into a process that harnesses the talents and insights of all participants to optimize project results, increase value to the owner, reduce waste, and maximize efficiency through all phases of design, fabrication, and construction. There are eight main sequential phases to the integrated project delivery method: The construction industry has suffered from a productivity decline since the 1960s while all other non-farm industries have seen large boosts in productivity. The problems in contemporary construction include buildings that are behind schedule and over budget as well as adverse relations among the owner, general contractor, and architect. Using ideas developed by Toyota in their Toyota Production System and computer technology advances, the integrated project delivery method is designed to solve these key construction problems. The new focus in IPD is the final value created for the owner, the finished building. Rather than each participant focusing exclusively on their part of construction without considering the implications on the whole process, the IPD method brings all participants together early with collaborative incentives to maximize value for the owner. This collaborative approach allows informed decision making early in the project where the most value can be created. The close collaboration eliminates a great deal of waste in the design, and allows data sharing directly between the design and construction team eliminating a large barrier to increased productivity in construction.

[ "Project management", "Construction management", "Process (engineering)", "Design–bid–build", "Architect-led design–build" ]
Parent Topic
Child Topic
    No Parent Topic