On-site transformer partial discharge diagnosis

2012 
In the lab, partial discharge diagnosis has widely replaced the traditional RIV measurements. Additionally, partial discharge acceptance levels are being reduced due to the increasing use of composite material and a growing awareness of partial discharge phenomenon and their consequences. Adequate filtering of the supply voltage for induced voltage testing and the use of sensitive acoustic measurement has greatly improved the detection and location of partial discharge activity in power transformers.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    7
    References
    2
    Citations
    NaN
    KQI
    []