First operational results with the ELETTRA fast local feedback system

1997 
A fast local feedback system has been installed on two of the ELETTRA beamlines. The first operational results are presented and compared with the performance foreseen with a simulated model of the system.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    6
    References
    3
    Citations
    NaN
    KQI
    []