Two-Stage Flowshop Scheduling with Outsourcing Allowed

2016 
In this paper we study the production-scheduling problem for a two-stage flow shop with outsourcing options. The maintenance of in-house machine and job-related discount for outsourcing cost are considered in model, in which total cost and makespan are regarded as bi-objective for the scheduling problem. Based on the analysis of model, we introduce a concept-packaging to reduce the complexity of problem and then develop heuristic algorithm to solve the problem. Computational experiments using different groups of data are conducted to test the algorithm.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    15
    References
    1
    Citations
    NaN
    KQI
    []