Fabrication progress of the ITER vacuum vessel sector in Korea

2013 
Abstract As a participant of ITER project, ITER Korea has to supply two ITER vacuum vessel sectors (Sector #6, #1) of total nine ITER VV sectors. After the procurement arrangement with ITER Organization, ITER Korea made the contract with Hyundai Heavy Industries (HHI) for fabrication of two sectors. Then the start of the manufacturing design was initiated from January 2010. HHI made three real scale R&D mock-ups to verify the critical fabrication feasibility issues on electron beam welding, 3D forming, welding distortion and achievable tolerances. The documentation according to IO and the French nuclear safety regulation requirement, the qualification of welding and nondestructive examination procedures conform to RCC-MR 2007 were proceed in parallel. The mass production of raw material was done after receiving ANB (agreed notified body) verification of product/parts and shop qualification. The manufacturing drawing, manufacturing and inspection plan of VV sector with supporting fabrication procedures are also verified by ANB, accordingly the first cutting and forming of plates for VV sector fabrication started from February 2012. This paper reports the latest fabrication progress of ITER vacuum vessel Sector #6 that will be assembled as the first sector in the ITER pit. The overall fabrication route, R&D mock-up fabrication results with forming and welding distortion analysis, qualification status of welding and nondestructive examination (NDE) are also presented.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    8
    Citations
    NaN
    KQI
    []