A GAP CLEARING KICKER FOR MAIN INJECTOR

2011 
Fermilab Main Injector has been operating at high Beam Power levels since 2008 when multi-batch slip stacking became operational [1]. In order to maintain and increase the beam power levels the localized beam loss due to beam left over in the injection kicker gap during slip stacking needs to be addressed. A set of gap clearing kickers that kick any beam left in the injection gap to the beam abort have been built. The kickers were installed in the summer of 2009 and became operational in November of 2010. The kicker performance and its effect on the beam losses will be described.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    4
    References
    4
    Citations
    NaN
    KQI
    []