Integrated production planning for the multiple-machine sheet metal shop with laser cutting and air bending

2008 
To compete with alternative production methods, sheet metal working firms need to improve continuously. Improvement efforts do not solely focus on the production processes, but also on other aspects of the production chain. Production planning is one of those aspects that need to be optimized. The presented research focuses on production planning optimization for sheet metal shops with a cutting stage and a bending stage. The combination of the production plans of the individual processes does not result in a globally optimal production plan. Consequently, both processes need to be integrated for production planning. In this paper, an integer programming formulation is presented for the multiple-machine two-stage sheet metal shop production planning problem. Numerous real-life test cases are used to benchmark the approach against the current way of planning. To limit the computational time, a dedicated variable neighborhood search procedure is presented.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    13
    References
    1
    Citations
    NaN
    KQI
    []