Initial diagnostics commissioning results for the APS injector subsystems

2008 
In recent months the first beams have been introduced into the various injector subsystems of the Advanced Photon Source (APS). An overview will be given of the diagnostics results on beam profiling, beam position monitors (BPMs), loss rate monitors (LRMs), current monitors (CMs), and photon monitors on the low energy transport lines, positron accumulator ring (PAR), and injector synchrotron (IS). Initial measurements have been done with electron beams at energies from 250 to 450 MeV and 50 to 400 pC per macrobunch. Operations in single turn and stored beam conditions were diagnosed in the PAR and IS.