A hybrid flowshop scheduling problem for a cold treating process in seamless steel tube production

2011 
Seamless steel tubes often have various categories and specifications, which further require complicated operations in production, especially in the cold treating process (CTP). This paper investigates the scheduling problem using the seamless tube plant of Baoshan Iron and Steel Complex as a study background. By considering the practical production constraints such as sequence-dependent setup times, maintenance schedule, intermediate material buffers, job-machine matches, we formulate the hybrid flowshop scheduling problem with a non-linear mixed integer programming model (NMIP). In addition, our model provides a flexibility to remove the permutation assumption, which is often a limitation in early studies. In order to obtain the solution of the above NMIP problem, a two-stage heuristic algorithm is proposed and it combines a modified genetic algorithm and a local search method. With real production instances, our computation experiments indicate that the proposed algorithm is efficient and it outperform...
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    26
    References
    6
    Citations
    NaN
    KQI
    []