Bi-Level Optimization for an Integrated Project Scheduling-Resources Supply System and Its Application

2018 
This paper places emphasis on the integration of resource-constrained project scheduling problem and resource supply chain problem in a construction project. Specifically, Stackelberg game optimization is used to describe the complex interactions exhibited in this integration, and a bi-level programming is developed to examine the Stackelberg game behavior objectively and accurately. To solve this model, an interactive genetic algorithm with double strings is designed to obtain the Stackelberg-Nash equilibrium solution. Finally, the results and analysis of a practical example are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    15
    References
    1
    Citations
    NaN
    KQI
    []