The ASME PRA Standard and the HCPRA Update
2004
A major revision of the Hope Creek Generation Station (HCGS) Probabilistic Risk Assessment (PRA) has been performed to provide the following:
(1)
An update of the model consistent with the ASME PRA Standard Capability Category II [1]
(2)
Incorporation of changes based on the NEI PRA Peer Review
(3)
Inclusion of the impact of a 20% Extended Power Uprate (EPU)
(4)
Modification of the fire and seismic PRA and integration of them with the internal events analysis
(5)
Performance of plant specific MAAP 4 thermal hydraulic analyses to support the updated success criteria, accident sequence timing, and radionuclide release magnitude.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI