Status of ITER

2002 
Abstract At the end of engineering design activities (EDA) in July 2001, all the essential elements became available to make a decision on construction of ITER. A sufficiently detailed and integrated engineering design now exists for a generic site, has been assessed for feasibility, and costed, and essential physics and technology R&D has been carried out to underpin the design choices. Formal negotiations have now begun between the current participants—Canada, Euratom, Japan, and the Russian Federation—on a Joint Implementation Agreement for ITER which also establishes the legal entity to run ITER. These negotiations are supported on technical aspects by Coordinated Technical Activities (CTA), which maintain the integrity of the project, for the good of all participants, and concentrate on preparing for procurement by industry of the longest lead items, and for formal application for a construction license with the host country. This paper highlights the main features of the ITER design. With cryogenically-cooled magnets close to neutron-generating plasma, the design of shielding with adequate access via port plugs for auxiliaries such as heating and diagnostics, and of remote replacement and refurbishing systems for in-vessel components, are particularly interesting nuclear technology challenges. Making a safety case for ITER to satisfy potential regulators and to demonstrate, as far as possible at this stage, the environmental attractiveness of fusion as an energy source, is also important. The paper gives illustrative details on this work, and an update on the progress of technical preparations for construction, as well as the status of the above negotiations.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    18
    Citations
    NaN
    KQI
    []