• 1633-RP, “Data and Interfaces for Advanced Building Maintenance and Operation;” Responsible Committee: TC 1.4 (Control Theory and Application); Co-Sponsor (s): TC 7.5 (Smart Building Systems), TC 7.6 (Building energy Performance), and TC 7.9 (Building Commissioning); Contractor: KGS Buildings LLC.; Duration: 24 months; Cost to ASHRAE: $266,570; Supports Research Strategic Goals: A7, B2, C6 (05-10) #1 (10-15) Plan