language-icon Old Web
English
Sign In

Nuclotron beam diagnostics

1999 
The superconducting synchrotron Nuclotron was put into operation in March 1993 at the Laboratory of High Energies, JINR in Dubna. The Nuclotron Control System (NCS) provided an efficient support for machine operation during all runs. The dedicated NCS subsystem for beam diagnostics in the injection transfer line and the Nuclotron ring is described.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    1
    References
    0
    Citations
    NaN
    KQI
    []