Survey of Measurements done in Connection with the Start-Up of R1 at 600 kw; SAMMANFATTNING OVER DE MATNINGAR SOM GJORDES I SAMBAND MED UPPKORNING AV R-1 TILL 600 KW
1956
A brief survey is given of ihe measurements made during ihe start-up of R-1. The control and adjustment of the security system is briefly considered, and the thermal efficiency and temperature distribution of channel 9 were determined. (J.S.R.)
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI