Survey of Measurements done in Connection with the Start-Up of R1 at 600 kw; SAMMANFATTNING OVER DE MATNINGAR SOM GJORDES I SAMBAND MED UPPKORNING AV R-1 TILL 600 KW

1956 
A brief survey is given of ihe measurements made during ihe start-up of R-1. The control and adjustment of the security system is briefly considered, and the thermal efficiency and temperature distribution of channel 9 were determined. (J.S.R.)
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []