Validation of Time-Dependent Repair Recovery of the Building Stock Following the 2011 Joplin Tornado

2020 
AbstractThis paper seeks to calibrate an existing analytical framework to develop building repair fragility models using a restoration dataset collected through a longitudinal field study in the ci...
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    2
    Citations
    NaN
    KQI
    []