ERATIONAL RESULTS WIT A FAST LOCAL FEE BACK SUSTE
1998
A fast local feedback system has been installed on two of the ELETTRA beamlines. The first operational results are presented and compared with the performance foreseen with a simulated model of the system.
Keywords:
- Correction
- Cite
- Save
- Machine Reading By IdeaReader
6
References
0
Citations
NaN
KQI