language-icon Old Web
English
Sign In

INFN Tier–1: a distributed site

2019 
The INFN Tier-1 center at CNAF has been extended in 2016 and 2017 in order to include a small amount of resources (∼ 22 kHS06 corresponding to ∼ 10% of the CNAF pledges for LHC in 2017) physically located at the Bari-ReCas site (∼ 600 km distant from CNAF). In 2018, a significant fraction of the CPU power (∼ 170 kHS06, equivalent to ∼ 50% of the total CNAF pledges) is going to be provided via a collaboration with the PRACE Tier-0 CINECA center (a few km from CNAF), thus building a truly geographically distributed (WAN) center. The two sites are going to be interconnected via an high bandwidth link (400-1200 Gb/s), in order to ensure a transparent access to data residing on CNAF storage; the latency between the centers is small enough not to require particular caching strategies. In this contribution we describe the issues and the results of the production configuration, focusing both on the management aspects and on the performance provided to end-users.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    4
    References
    3
    Citations
    NaN
    KQI
    []