Survey and alignment report on the primary control network for the APS

1993 
During November 1992 the survey and alignment team measured the entire primary control network for the APS. This task had to be finished before the enclosure of the EAA and the RF buildings were put in place, inhibiting several lines of sight necessary for the determination of the monument locations.