Fabrication and testing of the flexible transmission line to the TFTR neutral beam ion sources

1983 
The four Neutral Beam Injectors (NBI) on the TFTR Tokamak Test Cell (TTC) floor require twelve transmission lines to carry arc and filament power to the twelve ion sources from the basement. Also, the Neutral Beam Test Cell (NBTC) requires three lines but on the same floor through a wall. The same basic specifications apply: (1) center bundle operates at 120 kV with respect to the outer cables, (2) filament circuits at 6000 A, (3) arc circuits at 3000 A, (4) gradient grid, (5) accel grids in a quadrupole configuration, (6) multi wire control cable, (7) SF/sub 6/ environment, (7) flexible, (8) 36'' centerline bend radius and (9) hi-pot to 200 kV.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    2
    Citations
    NaN
    KQI
    []