Applying the European Electromagnetic Compatibility Directive to Large Scientific Plants: A Case Study
2021
The purpose of this work is to clarify how the European Electromagnetic Compatibility Directive (EMC Directive 2014/30/EU) has been applied to a large scientific construction plant. A detailed protocol based on the Product Breakdown Structure of the installation has been devised and successfully applied to a case study: the large scale observatory based on an array of Cherenkov Telescopes.
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI