Applying the European Electromagnetic Compatibility Directive to Large Scientific Plants: A Case Study

2021 
The purpose of this work is to clarify how the European Electromagnetic Compatibility Directive (EMC Directive 2014/30/EU) has been applied to a large scientific construction plant. A detailed protocol based on the Product Breakdown Structure of the installation has been devised and successfully applied to a case study: the large scale observatory based on an array of Cherenkov Telescopes.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []