Alignment and Aperture Scan at the Fermilab Booster

2012 
The Fermilab Booster is currently in the process of an intensity upgrade referred to as the Proton Improvement Plan (PIP). The goal of PIP is to have the Booster provide a proton beam flux of 2 x 10{sup 17} protons/hour. This is almost double the current operation of 1.1 x 10{sup 17} protons/hour. Beam losses in the machine due to the increased flux will create larger integrated doses on aperture limiting components that will need to be mitigated. The Booster accelerates beam from 400 MeV to 8 GeV at a rep rate of 15hz and then extracts beam to the Main Injector. Several percent of the beam is lost within 3 msec after injection in the early part of acceleration. The aperture at injection energy was recently measured using corrector scans. Along with magnet survey data and aperture scan data a plan to realign the magnets in the Booster was developed and implemented in May 2012. The beam studies, analysis of the scan and alignment data, and the result of the magnet moves are presented.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []