Magnetic and Mechanical Analysis of a Large Aperture 15T Cable Test Facility Dipole Magnet

2021 
The US Department of Energy (DOE) Office of Science (SC), is funding a large bore “Cable Test Facility Magnet” for testing advanced cables and inserts in high transverse field. This is a joint effort between the Office of High Energy Physics (HEP) and the Office of Fusion Energy Sciences (FES). The background field magnet for this facility is being developed at Lawrence Berkeley National Laboratory (LBNL) while the cryostat and test facility will be located and operated by Fermi National Accelerator Laboratory (FNAL). The ${\text{Nb}_{3}\text{Sn}}$ dipole magnet, which will provide the transverse background field, is designed to generate a field of 15 T in a 100 x 150 mm bore at 1.9 K. The conceptual design of a block-type dipole with flared ends and a structure based on key-and-bladder technology will be introduced. The results of the magnetic and mechanical analysis will be presented.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    20
    References
    2
    Citations
    NaN
    KQI
    []