Determination of Timing for Supply of Advance Flushing Fluid in Boreholes with Full Lost Circulation

2011 
In core drilling,drillers are often obsessed with when advance flushing fluid should be supplied in fully lost boreholes.Two methods about how to determine the supply time are put forward and compared with each other for drilling of lost boreholes.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []