170-265 Rocks Transportation Road Construction and Optimization in Fujiawu Mining Area

2011 
This paper emphasizes on 170-265 rocks transportation road construction methode and optimization in Fujiawu mining area,Dexing copper mine,introduces construction procedure,quality control,safety guarantee measure and large dump truck transportation safety of open-pit mine.This optimization and construction method is identified to achieve all the requirements of economic and safety through practice on site,provides referential experience and guidance for the future's project construction and optimization.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []