OTEC (Ocean Thermal Energy Conversion) plant optimal design, fabrication and inspection specifications for OTEC ocean engineering systems
1981
The purpose of the report is to give recommendations for possible modifications of the minimum technical requirements for the OTEC pilot plant to obtain optimal technical specifications considering total lifetime costs, lost income associated with production downtime, etc., without infringing on the minimum required safety level.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
1
Citations
NaN
KQI