Study on Control Strategy of Nujiang Power Grid in Cooperative Operation

2018 
After the Nujiang grid is divided, the overall grid structure is divided into two parts. That is, the power delivery channel and the distribution network load power supply channel. The basic grid of Nujiang has been fundamentally changed. The inherent difficulties in the operation of the Nujiang grid will remain and may lead to new problems. This paper systematically expounds the problems existing in the operation of power grids. For the new problems and some of the original problems, specific solutions are given.