Research on Experimental Verification Scheme of 5G in Power System

2020 
This paper presents a new and higher requirement for the collection, bearing, analysis and application of the power base data in the power network, and puts forward a higher requirement for the communication technology. The development requirements of State Grid Corporation are also highly in line with the scenario of 5G application. In response to this situation, the network performance, application mode, network scheme and security policy of 5G wireless communication are tested. The test scheme includes the laboratory test and the outfield test, and the test scheme is given. The test scheme verifies the supporting ability of 5G technology in power system, and lays a foundation for the application of 5G technology in power system.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    8
    References
    0
    Citations
    NaN
    KQI
    []