Study Risk Evaluation of Emergency Logistics Plans

2012 
In this paper,we first determined the dimensions for the evaluation of emergency logistics plans,which were timeliness,reliability and economy;and then we used the entropy metrics to analyze the general risk level of the emergency logistics plans and subjected the metrics to standardizing treatment.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []