Statistical process control (SPC) methods were used to analyze 239 measurement based individual IMRT QA events. The selected IMRT QA events were all head and neck (H&N) cases with 70Gy in 35 fractions, and all prostate cases with 76Gy in 38 fractions planned between March 2009 and 2012. The results were used to determine if the tolerance limits currently being used for IMRT QA were able to indicate if the process was under control. The SPC calculations were repeated for IMRT QA of the same type of cases that were planned after the treatment planning system was upgraded from Eclipse version 8.1.18 to version 10.0.39. The initial tolerance limits were found to be acceptable for two of the three metrics tested prior to the upgrade. After the upgrade to the treatment planning system the SPC analysis found that the a priori limits were no longer capable of indicating control for 2 of the 3 metrics analyzed. The changes in the IMRT QA results were clearly identified using SPC, indicating that it is a useful tool for finding changes in the IMRT QA process. Routine application of SPC to IMRT QA results would help to distinguish unintentional trends and changes from the random variation in the IMRT QA results for individual plans.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    1
    Citations
    NaN
    KQI
    []