A polynomial-time approximation scheme for parallel two-stage flowshops under makespan constraint

2022 
As a hybrid of the Parallel Two-stage Flowshop problem and the Multiple Knapsack problem, we investigate the scheduling of parallel two-stage flowshops under makespan constraint, which was motivated by applications in cloud computing and introduced by Chen et al. recently. A set of two-stage jobs are selected and scheduled on parallel two-stage flowshops to achieve the maximum total profit while maintaining the given makespan constraint. We give a positive answer to an open question about its approximability proposed by Chen et al. . More specifically, based on guessing strategies and rounding techniques for linear programs, we present a polynomial time approximation scheme (PTAS) for the case when the number of flowshops is a fixed constant. As the case with two flowshops is already strongly NP-hard, our PTAS achieves the best possible approximation ratio.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []