A Flexible And Cost-Effective ASIC Line Management Technology Using Operator-Level Scheduling

1994 
High cost-peformance production of ASICs is achieved when the super operator shift method is applied to an ASIC line using a newly developed scheduler with operator level and wafer-level scheduling functions.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    1
    References
    0
    Citations
    NaN
    KQI
    []