Stochastic Multistage Co-optimization of Generation and Transmission Expansion Planning

2019 
This paper describes a generation and transmission (GT (ii) an SDDP-based "operation module" calculates the expected operation costs for the trial plan and Benders cuts to the investment module based on the expected marginal costs of the capacity constraints at the optimal solution. The integrated G&T planning approach is illustrated with a realistic planning study for the Bolivian power system.