BEAM DIAGNOSTIC SYSTEM OF THE MAIN RING SYNCHROTRON OF J-PARC ofJ-PARC

2008 
The J-PARC MR beam monitor system have been installed and tested at day-one beam commissioning started this May. In this paper, the requirements for the monitor system to achieve high power beam acceleration up to 50 GeV, 0.73MW, andthe present performances are presented.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []