Final Design of the Fully Equipped HWR Cavities for SARAF

2017 
SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the superconducting linac (SARAF-LINAC Project). The SCL is made up of 4 cryomodules: the first two will host each 6 half-wave resonator (HWR) low beta cavities (β = 0.09) at 176 MHz; the last two will host each 7 HWR high-beta cavities (β = 0.18) at 176 MHz. The fully equipped cavity includes the niobium cavity with a helium tank, an input power couplers and a frequency tuning system. The final RF design of the low and high beta cavities will be presented in this poster, as well as the RF design of the couplers, the expected tuning range of the cavities and the multipactor analysis.