Measured short-term ground surface response to EPBM tunnelling in London Clay
2017
Earth-pressure-balance machines (EPBMs) were used for the construction of Crossrail tunnels in London, providing opportunities for field investigation of consequent ground response. Analysed results from an instrumented research site in Hyde Park with extensive surface and subsurface monitoring arrays are presented and discussed. The Crossrail tunnels at the site are 34·5 m below ground, deeper than those in most case histories of tunnelling in stiff clay in the UK. This paper characterises the tunnelling-induced ground response, both ‘greenfield’ and in the proximity of the existing Central Line tunnels, dealing with measurements at the ground surface. A companion paper covers the subsurface ground response. Vertical and horizontal ground surface displacements were obtained from manual precise levelling and micrometer stick measurements. Several key findings will benefit future tunnelling projects involving EPBMs. Volume loss values measured at the instrumented site were low, being less than 0·8% and 1·4...
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
18
References
20
Citations
NaN
KQI