According to existing rigid roofing projects, a new structure called the Levy hinged-beam cable dome is proposed. By replacing the upper flexible cables with hinged beams, rigid plates can be installed overhead. To fulfill the requirements of integral tow-lifting construction, the setting criteria for the temporary hinged joints on ridge beams were presented. An 8-m diameter specimen was manufactured and monitored to investigate the structural configurations during the accumulative traction-hoisting construction process. Finally, the specimen was tested under full-span and half-span loading conditions, while a numerical model was built to verify the experimental values. The results show that in the early stages of traction-hoisting, the structure establishes the overall prestress and finds its internal force balance, while the entire structure is in a shape of “ω”. As the component’s internal force increases during the construction steps, and the local deformations of the hinged beams gradually decrease, with the entire structure changing from “ω” to “m”, and finally reach their designed states. Under full-span loads, large local deformations occurred at the HB-3 hinges, while the bending stresses of these hinged beams were relatively small. Under half-span loads, the loading part exhibits a downward appearance, while the unloading part exhibits upward deflection.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    22
    References
    0
    Citations
    NaN
    KQI
    []