Installation of Integral Prefabricated Bridge Abutment and Pier with Flexible Water Stop Curtain

2018 
AbstractConstruction of the abutment, pier, and pier cap of long cross-sea bridges are challenging in complex marine environments. In the Hong Kong–Zhuhai–Macao Bridge (HZMB) project, an installati...
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    1
    Citations
    NaN
    KQI
    []