Installation of Integral Prefabricated Bridge Abutment and Pier with Flexible Water Stop Curtain
2018
AbstractConstruction of the abutment, pier, and pier cap of long cross-sea bridges are challenging in complex marine environments. In the Hong Kong–Zhuhai–Macao Bridge (HZMB) project, an installati...
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
1
Citations
NaN
KQI