COMMISSIONING OF RHIC AT 100 GEV/NUCLEON*

2002 
This report describes commissioning of the Relativistic Heavy Ion Collider (RHIC) for 100 GeV/nucleon collisions at designed luminosity. To achieve these goals new systems had to be commissioned: Gamma-t transition crossing jump quadrupoles, rebucketing with the new RF storage cavities, phase lock loop feedback, betatron and crystal collimation, beta squeeze along the ramp, Siberian snake magnets for the proton polarization run, AC dipole system, chromaticity measurements along the acceleration ramp, orbit correction, new ramp management system, upgraded sequencer, new data instrumentation and logger acquisition system etc.