Handbook of methods for risk-based analysis of technical specifications

1996 
Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operations (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements are based on deterministic analyses and engineering judgments. Improvements in these requirements are facilitated by the availability of plant-specific Probabilistic Risk Assessments (PRAs). The US Nuclear Regulatory Commission (USNRC) Office of Research sponsored research to develop systematic, risk-based methods to improve various aspects of TS requirements. A handbook of methods summarizing such risk-based approaches has been completed in 1994. It is expected that this handbook will provide valuable input to NRC`s present work in developing guidance for using PRA in risk-informed regulation. The handbook addresses reliability and risk-based methods for evaluating allowed outage times (AOTs), action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), managing plant configurations, and scheduling maintenance.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    43
    Citations
    NaN
    KQI
    []