The construction of the KLOE drift chamber: Present status KLOE Drift Chamber Group
1998
Abstract The status of the construction of the KLOE Drift Chamber is reviewed. With its 4 m diameter, it will be the biggest drift chamber ever built. The stringing of 52 000 wires is a titanic effort: details are given about the semiautomatic system, the quality tests on wires and the monitoring of end-plates deformations.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
2
Citations
NaN
KQI