Safety Constraints and Optimal Operation of Large-scale Nuclear Power Plant Participating in Peak Load Regulation of Power System

2017 
Comprehensively considering the operation cost and safety constraints of nuclear power, an optimal operation scheme of large-scale nuclear power plant participating in peak load regulation of power system is proposed. After quantitatively analysing the peak load regulation cost of nuclear power, the optimal objective is set to minimise the total operation cost including the fuel cost, the start–stop cost, and the peak load regulation cost. On the basis of the normal constraints of power scheduling, safety constraints of the nuclear power unit's daily output performance and power characteristic constraints of the pumped storage unit are considered. The mixed integer programming method is used to achieve the solution of the optimal operation scheme. Simulation results from a regional power system show that the proposed optimal operation scheme can effectively reflect the real characteristic of nuclear power and apply to power dispatching analysis under the background of the large-scale access of nuclear power. In comparison to other two typical schemes of peak load regulation, the proposed optimal operation scheme of peak load regulation is more economic and efficient.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    23
    References
    18
    Citations
    NaN
    KQI
    []