NS stud welding method for connecting steel pipe sheet piles to footing concrete of steel pipe pile foundation
1989
A combination cofferdam and steel pipe sheet pile foundation requires the steel pipe sheet piles to be connected to the footing concrete. To make this connection, a method was developed whereby long deformed bars of 19-mm diameter are stud welded to the steel pipe sheet piles. Called the NS stud welding method, the new process can measurably shorten the construction time as compared with conventional methods