Void Filler Foam Accelerated Load Testing

1976 
Abstract : This report presents the Phase IV program to qualify void filler foam for use in military aircraft. Phases I, II, and III of this task also are summarized in this report to show the evolution of the void filler foam concept. The purpose of the foam installation around the aircraft fuel cell is to reduce projectile damage, fuel fire hazard, improve thermal protection and aircraft survivability. The accelerated load testing was conducted to determine the ability of void filler foam to withstand the loads encountered during aircraft carrier deck operations. Results of the program show the void filler foam, used as a replacement for the backingboard on an A-4 aircraft, can withstand the loads assoicated with catapult launch and arrested landings.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []