Optimizing the Schedule of Dispatching Earthmoving Trucks through Genetic Algorithms and Simulation

2012 
AbstractMost construction projects involve earthmoving operations. Careful management of trucks to perform these operations is considered crucial by earthwork contractors in Taiwan. A mechanism is described that optimizes the management of the truck fleets of earthwork contractors. The proposed model integrates a discrete event simulation technique and genetic algorithms (GAs) to minimize the duration of earthmoving operations. The discrete simulation model is applied to simulate earthmoving operations and generate schedules for dispatching various trucks, and the GAs are used as a filter to screen out schedules that require long trips. Examples prove that the proposed model can determine near-optimal solutions efficiently. In addition, a user-friendly computer program is developed so that earthwork contractors can plan the dispatch schedule of earthmoving trucks easily and effectively.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    14
    References
    10
    Citations
    NaN
    KQI
    []