Mixed enrichment core design for the NC State University PULSTAR Reactor

1997 
The North Carolina State University PULSTAR Reactor license was renewed for an additional 20 years of operation on April 30, 1997. The relicensing period added additional years to the facility operating time through the end of the second license period, increasing the excess reactivity needs as projected in 1988. In 1995, the Nuclear Reactor Program developed a strategic plan that addressed the future maintenance, development, and utilization of the facility. Goals resulting from this plan included increased academic utilization of the facility in accordance with its role as a university research facility, and increased industrial service use in accordance with the mission of a land grant university. The strategic plan was accepted, and it is the intent of the College of Engineering to operate the PULSTAR Reactor as a going concern through at least the end of the current license period. In order to reach the next relicensing review without prejudice due to low excess reactivity, it is desired to maintain sufficient excess reactivity so that, if relicensed again, the facility could continue to operate without affecting users until new fuel assistance was provided. During the NC State University license renewal, the operation of the PULSTAR Reactor at the State University of New York at Buffalo (SUNY Buffalo) was terminated. At that time, the SUNY Buffalo facility had about 240 unused PULSTAR Reactor fuel pins with 6% enrichment. The objective of the work reported here was to develop a mixed enrichment core design for the NC State University PULSTAR reactor which would: (1) demonstrate that 6% enriched SUNY buffalo fuel could be used in the NC State University PULSTAR Reactor within the existing technical specification safety limits for core physics parameters; (2) show that use of this fuel could permit operating the NC State University PULSTAR Reactor to 2017 with increased utilization; and (3) assure that the decision whether or not to relicense the facility would not be prejudiced by reduced operations due to low excess reactivity.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []