Hollow Slab hinge joints disease treatment program and its construction process

2011 
The present invention relates to a seam joint diseases same slab processing scheme and the construction process, including between the hollow plate, the hinge plate forms a hollow slit plate is provided with a hollow deck pavement, the hinge joints with a tear strip is provided on the lower opening, the sealing strip is provided with a sealing layer, the sealing layer is disposed within the hinge slit, provided with a subbing layer on pouring a sealing layer is provided with a filling hole, filling the hole in communication with the lumen hinge slit deck pavement, two hollow Itabashi hollow panel provided with a first side of the bottom surface of steel anchor seat, the bottom surface of the middle plate is provided with a second hollow steel anchor seat, the first and second anchorage steel steel steel anchorage via, the present invention is a hinge slit is closed under the mouth and the inorganic filler pouring glue the hinge joints, the adjacent hollow panel by tight junctions existing in the inorganic reinforcement and pouring plastic hinge sewn together, while the bridge between the bottom surface of the hollow plate disposed tensioning means in the case without removing the existing bridge deck and does not affect traffic operations, the connection between the hollow plates meet current code requirements.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []