The Practicalities of Optimizing Automated Longwall Plough Systems under the Conditions Prevailing at the LW ""Bogdanka"" S.A. Mine - Special Longwall Cavity Lining and Output Self-Loading system at the Longwall-Heading Crossing
2011
- Correction
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI