BN-800 design validation and construction status

2010 
Information is presented on the BN-800 design, the second design following BN-600, power-generating unit with a fast reactor. The main stages of the development of the design begun in the 1980s, modified in the 1990s after the Chernobyl accident, and accepted for construction within the government program starting in 2000 are presented. The fundamental differences of BN-800 from BN-600 are characterized, and current R&D work is briefly described. Information is presented on the construction of BN-800 at the Beloyarskaya nuclear power plant, where the BN-600 has been operating since 1980.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    16
    Citations
    NaN
    KQI
    []